← Back to Insights
AI AUTOMATION

The AI Integration Checklist Every B2B Company Needs Before Going Live

Chris VanIttersum
Chris VanIttersum
February 2026 | 7 min read
Operations team planning AI integration around a conference table

Gartner found that at least 50% of generative AI projects were abandoned after proof of concept by the end of 2025. A separate Gartner prediction from February 2025 warned that through 2026, organizations would abandon 60% of AI projects unsupported by AI-ready data. The common thread: not model failures, but preparation failures.

Meanwhile, companies with strong data integration achieved 10.3x ROI from AI initiatives, according to Integrate.io's 2026 analysis—compared to just 3.7x for those with poor data connectivity. The gap between AI success and AI failure isn't about technology choice. It's about readiness.

This checklist covers the preparation that separates the 50% that stall from the organizations that reach production.

Phase 1: Pre-Integration Assessment

Before signing contracts or writing integration code, four categories of questions need answers.

Data Readiness

Complete a data inventory. Map every system where relevant data lives—ERP, CRM, inventory, order management, and the spreadsheets and shadow systems that nobody wants to talk about. According to Gartner's 2025 data readiness research, lack of AI-ready data is the single largest project killer.

Assess data quality. Evaluate completeness, accuracy, and consistency for each source. Industry research compiled by Integrate.io showed 85% of big data projects fail, with data quality cited as the primary cause. Budget two to three times the time initially estimated for data cleanup.

Document data access. Map API availability, authentication methods, rate limits, and quotas for every system. If a critical system only supports batch exports, that's a constraint that shapes the entire integration architecture.

Confirm historical data. Most AI models need 12–24 months of clean historical data. If that doesn't exist, building it becomes the first project milestone—not a footnote.

Technical Infrastructure

Document current architecture. Create a current-state diagram showing all systems, integration points, and data flows. Include the manual steps. Especially include the manual steps.

Identify integration patterns. Determine push versus pull, synchronous versus asynchronous, frequency, and error handling for each connection point. McKinsey's 2025 State of AI found that workflow redesign had the single biggest effect on whether organizations captured EBIT impact from AI—integration patterns are where that redesign starts.

Define security requirements. Authentication, network requirements, encryption standards, and compliance needs. For B2B distribution, this typically includes PCI compliance for payment data and SOC 2 for cloud-hosted components.

Choose a deployment model. Cloud versus on-premise, single versus multi-tenant, geographic data residency. Mid-market distributors increasingly use hybrid approaches—cloud AI services connected to on-premise ERP systems through secure API gateways.

Technical team mapping integration architecture on a whiteboard
Current-state architecture mapping—including manual workarounds—is the most frequently skipped step in AI integration projects.

Organizational Readiness

Name an executive sponsor. Identify the person with authority to resolve conflicts, approve budget changes, and make final decisions. Projects without clear executive ownership stall at the first cross-departmental disagreement.

Assign a technical owner. One person responsible for day-to-day integration decisions and vendor coordination. Not a committee.

Map stakeholders. List every affected team, their concerns, and their definition of success. When Gartner surveyed organizations about AI project abandonment, misaligned stakeholder expectations ranked alongside poor data quality as a primary cause.

Draft a change management plan. How will affected users learn about, be trained on, and transition to AI-enabled processes? Run this in parallel with technical implementation—not after.

Free Assessment

Is Your Business Actually Ready for AI?

Cut through the hype. This 5-minute assessment evaluates your data, processes, team, and tech stack — and gives you an honest roadmap.

Take the AI Readiness Assessment

Phase 2: Integration Planning

Design the integration architecture. Document data flows, entry and exit points, transformations, staging areas, and monitoring. Specify error handling—retry logic, alert thresholds, escalation paths, and fallback procedures. Define performance requirements: data volumes, latency limits, throughput, and concurrent user capacity.

Build a testing strategy. Establish environments that mirror production. Prepare test data weighted toward normal cases (80%), edge cases (15%), and failure cases (5%). Define testing phases: unit, integration, user acceptance, and performance.

Every day of testing skipped typically costs a week of production firefighting. That ratio comes up consistently in post-implementation reviews.

Phase 3: Go-Live

Launch day: notify stakeholders, execute the deployment per runbook, complete validation checks, and initiate a hypercare period with elevated monitoring and support.

Post-launch: establish success metric baselines, set a regular review cadence (weekly for the first month, biweekly after), update documentation with what actually happened versus what was planned, and capture lessons learned while they're fresh.

Where Integrations Fail

Failures cluster in three areas. Data quality—companies underestimate cleanup time. Testing depth—pressure to launch leads to gaps that become production fires. Change management—technical integration succeeds but users don't adopt because they weren't prepared.

The 42% of companies that abandoned AI initiatives in 2025, according to Fullview's analysis, didn't all have bad technology. Many had good technology and bad preparation. This checklist exists to prevent that.

Stay Ahead of the Curve

Get weekly insights on AI, distribution, and supply chain delivered to your inbox.